Home / Print Handbook

Print Handbook

The whole knowledgebase compressed to the pages you would actually carry to the field: key numbers, systems, the year at a glance, drying specifications, feed rates, pest actions, prices, labour and compliance — on tables designed to be printed and pinned up.

🖨️ How to print this page

Use the button above, or your browser's own print command, and choose Save as PDF as the destination if you want a file to share. The navigation, footer and on-page buttons are removed automatically when printing, and tables are set not to split across pages — so what comes out of the printer is the reference material and nothing else. Print in landscape if your tables run wide.

Every figure here is a summary of a chapter, and it inherits that chapter's caveats. Where a number is a range on the site, it is a range here. Where a decision is site-specific — your soil, your rainfall, your buyer — the handbook deliberately does not flatten it into a single answer.

Key numbers at a glance

FigureRange to plan withFull detail in
First leaf harvest after planting60–90 daysHarvest calendar
Cut interval35–45 days intensive · 60–75 days hedgePruning
Stump height at harvest45–60 cm, never lowerPruning
Fresh leaf yield, established block≈ 20 t/ha/yr hedge · up to ≈ 45 t/ha/yr intensive · ≈ 4 t/ha/yr fence rowSpacing systems
Dry pod yield, pod orchard1–3 t/ha/yr (seed ≈ ¼ of pod weight)Pod system
Fresh-to-dry conversion≈ 4–5 kg fresh → 1 kg dried leaf powderDrying
Drying temperature40–50 °C tea-grade · 50–55 °C powderDrying
Finished moisture≤ 7% powder · ≤ 8% tea-grade leaf (wet basis)Moisture
Crude protein, dried leaf≈ 25–30% in good food-grade powderComposition
Milling mesh, food grade40–80 meshMilling
Oil in mature seed kernel≈ 30–40%Oil extraction
Plants per hectare, hedge at 1×1 m≈ 10,000Calculator
Sowing rate, 1 ha at 1×1 m, direct seeded≈ 25,000 seeds ≈ 6 kg at 4,000 seeds/kg and 80% germinationPlanning calculators
Dry-season water use, established hedge≈ 3–5 mm/day, roughly 3–5 litres per plant per dayIrrigation
Nursery bags for a hectare≈ 11,500 bags with a 15% cull allowance, ≈ 17 m³ of media at 1.5 L per bagPlanning calculators

Planting systems and what each one is for

SystemSpacingBest forThe catch
Perennial leaf hedge1 × 1 mThe standard commercial leaf block — sturdy, forgiving, sustainable cutsNeeds real management to hold yield year after year
Intensive irrigated leaf≈ 0.45 × 0.18 mMaximum leaf output where water and fertilizer are reliableDemands drip irrigation, heavy fertilization and same-day postharvest handling
Pod orchard4 × 4 mDrumstick pods, seed for planting and oilEssentially no leaf income by design; slow to first income
Living fence≈ 0.8 m in a single rowHousehold supply and side income from a boundary that already existsSmall absolute volume; harvest must fit around the fence's other jobs
Intercrop / under-treeDepends on the host cropCoconut, banana, young orchards, contour hedgerowsLight and root competition — see Agroforestry

The year at a glance

A generic Philippine pattern (Type I rainfall: dry November–April, wet May–October). Shift it for your own province using the regional playbooks.

MonthField workThe one thing that matters
JanuaryHarvest cuts; irrigation; mulch the hillsDrying is at its easiest — bank quality lots now
FebruaryHarvest; weeding; scouting for webber and mitesDry-season pests build fastest in the last dry weeks
MarchIrrigate the best block first; defer cuts under stressHeat and water stress cut yield more than any pest
AprilClear and open drains; repair racks, dryers and storeEverything you want to have fixed must be fixed before the rain
MayPlant or replant; check drainage; first weed flushEstablishment decisions set the next three years
JuneHarvest; watch leaf spot; covered drying beginsDrying capacity, not leaf supply, becomes the bottleneck
JulyWeed, fertilize, keep the block open to airflowSanitation beats spraying — remove infected flush
AugustHarvest on schedule if the block is sound; dry under coverNever leave wet leaf standing overnight
SeptemberPre-storm checks; prune low profile; secure structuresPeak typhoon season begins — see the storm protocol
OctoberPost-storm assessment; document damage; salvage to the dryerPhotographs and dates are what an insurance claim runs on
NovemberAssess the block; plan rejuvenation; replant gapsGap-fill now, or lose another year of production
DecemberHard cut for rejuvenation on the older blocks; top-dressRenewal at the start of the dry season, never into the rain

Drying and processing quick specifications

StepSpecificationFailure looks like
HarvestYoung flushes, 60–75-day cuts, cut in the morningFibrous leaf, dull colour, low protein
StrippingLeaf only, minimal stem loadHigh crude fibre, poor mesh yield, gritty powder
WashingPotable water, drained properlyMud, grit and contamination from dry soil splash
Drying40–50 °C tea · 50–55 °C powder; uniform thicknessDull olive-brown colour, musty aroma, mould
Moisture at release≤ 7% powder · ≤ 8% tea-gradeCaking, clumping and mould weeks after packing
CoolingFully cool before milling and before packingCondensation inside the pack; warm powder sweats
MillingShort bursts, cool, sieve to 40–80 meshHeat-damaged colour and flavour
PackingBarrier liner or foil, sealed, lot-coded, datedMoisture regain and light degradation in storage
StorageCool, dark, dry, off the floor, first-in first-outInsects, rodents, condensation damage

Batch size, rack depth, water to remove and rack area for your own plan: compute them in the drying calculator.

Feed inclusion quick table

SpeciesCommonly reported inclusionThe ceiling is crude fibre
Pigs≈ 2–5% of the ration; up to 5% reported with no negative effect on feed conversionAbove the reported range, intake and performance typically fall
Broilers and layersLow single-digit percentagesPerformance generally declines as inclusion rises into double digits; yolk and skin colour improve at low rates
Cattle and goatsSubstantially higher tolerance than monogastricsThe most forgiving fit — ruminant fermentation handles the fibre
Tilapia≈ 10% widely cited; fermented leaf meal reported far higher for fishmeal replacementBest-studied aquaculture application; start low and trial
Milkfish, shrimpNot well establishedTreat as unproven — trial locally before offering the material

Leaf meal is an ingredient, not a diet. Never substitute it one-for-one for soybean or fish meal without rebalancing energy and amino acids, and keep the premix in the formula. Blend and price your own ration in the feed inclusion calculator.

Pest and disorder quick actions

You seeAct this wayPage
Webbed shoots, chewed leaflets, dark droppingsPrune out and destroy webbed shoots now; light traps; Bt on young larvae onlyLeaf feeders
Curled tips, sticky honeydew, sooty black filmWater jet; sticky traps; manage ants; neem or soap to escalateLeaf feeders
Pale speckling that bronzes in hot dry weatherWash the canopy, keep plants watered, oil or sulfur, rotate modes of actionLeaf feeders
Hollowed stems, frass, collapsing young plantsCut back to sound wood; stop wounding stems; bait at site level, not on the cropStems & roots
Dark soft tissue at the base after heavy rainDrain immediately; remove and destroy plants; replant on a moundStems & roots
Spreading brown or black leaf spots in wet weatherOpen the canopy, stop late-day overhead irrigation, remove infected flushDiseases
Gradual wilting in a dry spellThis is water stress, not a pest — irrigate, mulch, defer the cutDisorders
Yellow leaves with a uniform patternSoil test before guessing; replace N and K after every cutDisorders
Mould or caking in stored powderThe batch was packed too wet or too warm — never repack; fix the dryerStorage

Full tables, the interactive triage tool and the spraying rules — including pre-harvest intervals and the FPA registration requirement — are in the Pest & Disease Encyclopedia.

Prices, labour and money

ItemIndicative band
Fresh leaves, farmgate₱10–25 / kg
Fresh leaves, retail market₱20–50 / kg (often ₱5–15 per bundle)
Dried leaf powder, wholesale₱300–800 / kg
Dried leaf powder, retail packaged≈ ₱150–300 / 100 g
Leaf meal, feed grade₱12–25 / kg
Tea bags / blended tea₱80–250 / box
Moringa oil (ben oil)₱2,000–6,000+ / litre in small batches
Seed for sowing₱500–3,000 / kg
Seedlings and cuttings₱10–50 / piece
Steady-state labour, leaf hedge≈ 110–165 man-days / ha / yr; ≈ 150–245 if you also process

Indicative ranges from the price landscape and the labour calendar, to be replaced with your own local figures. Run your own plan in the Density & Income Calculator; the funding routes are in Financing & Risk.

Compliance checklist

StepWhat it coversWhen you need it
Business registrationDTI or SEC, BIR, LGU permitBefore selling anything commercially
FDA licence to operate (LTO)Your facility, for food processing and packingBefore processing for sale
Product registration (CPR)The specific product, per SKUBefore retail packed product goes out
Label sign-offIngredients, net weight, lot code, nutrition claims, warningsBefore printing any packaging
GMP / SSOP / HACCPFood-safety systems and recordsWhen a buyer or a market requires it
Organic certificationPGS (low cost) or third-party for exportWhen you want an organic price or an export market
Halal certificationPAB-accredited bodyFor halal-sensitive export markets
Per-lot laboratory testingMoisture, microbiology, heavy metals, aflatoxin, residues as requiredPer the buyer's or destination market's requirements
Lot traceabilityDelivery ← production ← drying batch ← source blockFrom your first commercial sale onward

The detailed sequence, costs and common mistakes are in Compliance & Certification; the export documentation set is in the Export Playbook.

First ninety days

Weeks 1–2 · Decide the job. One primary product, one primary market. Write down the block size, the system, the cut interval and the price you expect — using the calculator rather than a guess.
Weeks 2–3 · Test the ground and the water. Soil pH and drainage; where water stands after heavy rain; irrigation available in the dry season. Fix drainage before planting anything.
Weeks 3–5 · Source planting material and prepare land. Named seed or cutting source, clean nursery, land prepared with compost and lime as the soil test directs.
Weeks 5–8 · Plant and establish. Correct spacing, plant in the rainy window, water in, keep the ring clear of weeds for the first eight weeks.
Weeks 8–10 · Build the drying bench. Racks, a covered area and a moisture meter — before the first harvest, not after it.
Weeks 10–13 · Talk to buyers. Market vendors, canteens, restaurants, processors. Agree a first order and its specification while the first flush is growing.
Week 13 · Start the record book. Scouting counts, harvest weights, moisture at packing, prices, buyers. Every later decision in this knowledgebase is easier with four weeks of your own numbers behind it.
📄 The five-page version

If you only print part of this handbook, print Key numbers, The year at a glance, Drying quick specifications, Feed inclusion and Pest and disorder quick actions. That is a season's worth of decisions on five sheets, and everything else on the site is the explanation behind them.